Overburden Removal , mining , screening & transporting phosphate in Northing Orebodies  7+41+36

  • Project Name: Overburden Removal , mining , screening & transporting phosphate in Northing Orebodies  7+41+36
  • Location of Project : Al Abiad Mine
  • Client : Jordanian Phosphate Company (JPMC)
  • Awarded date of Project : 8-2013
  • Quantities of Project :
  • Overburden removal (OB) quantities = 83.6  Million  BCM
  • Mining Phosphate quantities =4.55 Million BCM
  • Screening & Crushing quantities = 7 Million Ton
  • Completion = 100 %
  • Scope of Work :
  • Overburden & internal waste Removal (83.6 MBCM) using excavator & wheal loader and transport the OB to the waste yards and cleaning with dozing.
  • Phosphate Mining (4.55MBCM) Cleaning by graders and dozers.
  • Transportation using dump truck to screen unit
  • Crushing & Screening Quantities (4.7MT)
  • Operate (closed vibrating plant system) which high by max. the yield and min. rejection.
  • Feeding 50cm hopper by wheel loaders & dump trucks
  • Classification / separation of materials by Jaw & Rotary crusher
  • Crushing & sizing the materials to pass 100% of -4mm or -6mm or -8mm
  • All materials handled by conveyor belts then transport product to piles
  • Mixing & blending the product to get the required homogenous
  • Drying the product by solar sun and wind energy to reduce moisture content.
  • Drying the product by Dryer unit to reduce moisture content (3%)
  • Hauling the oversize (reject) material to waste yards (Stockpiles) and dozing
  • Use wheel loader for loading dispatching trucks for direct shipping & transportation to Al Abiad Mine (24Km).
  • All productivity maintenance activities of conveyor belts and vibrating screens plants performed by in house team.