Overburden removal, mining & screening phosphate in Orebodies (31+35)
- Project Name: Overburden removal, mining & screening phosphate in Orebodies (31+35).
- Location of Project : Al Abiad Mine
- Client : Jordanian Phosphate Company (JPMC)
- Awarded date of Project : 10-2012
- Quantities of Project :
- Overburden removal (OB) quantities = 27.5 Million BCM
- Mining Phosphate quantities =2.3 Million BCM
- Screening & Crushing quantities = 78 Million Ton
- Completion = 100 %
- Scope of Work :
- Overburden Removal using excavator & wheal loader and transport the OB to the waste yards and cleaning with dozing.
- Phosphate Mining, Cleaning by graders and dozers
- Transportation using dump truck to screen unit
- Operate (closed vibrating plant system) which high productivity by max. the yield and min. rejection.
- Feeding 50cm hopper by wheel loaders & dump trucks
- Classification / separation of materials by Jaw & Rotary crusher
- Crushing & sizing the materials to pass 100% of -8mm
- All materials handled by conveyor belts then transport product to piles
- Mixing & blending the product to get the required homogenous
- Drying the product by solar sun and wind energy to reduce moisture content.
- Hauling the oversize (reject) material to waste yards (Stockpiles) and dozing
- All productivity maintenance activities of conveyor belts and vibrating screens plants performed by in house team.