Overburden removal, mining & screening phosphate in Orebodies (31+35)

  • Project Name: Overburden removal, mining & screening phosphate in Orebodies (31+35).
  • Location of Project : Al Abiad Mine
  • Client : Jordanian Phosphate Company (JPMC)
  • Awarded date of Project : 10-2012
  • Quantities of Project :
  • Overburden removal (OB) quantities = 27.5 Million  BCM
  • Mining Phosphate quantities =2.3 Million BCM
  • Screening & Crushing quantities = 78 Million Ton
  • Completion = 100 %
  • Scope of Work :
  • Overburden Removal using excavator & wheal loader and transport the OB to the waste yards and cleaning with dozing.
  • Phosphate Mining, Cleaning by graders and dozers
  • Transportation using dump truck to screen unit
  • Operate (closed vibrating plant system) which high productivity by max. the yield and min. rejection.
  • Feeding 50cm hopper by wheel loaders & dump trucks
  • Classification / separation of materials by Jaw & Rotary crusher
  • Crushing & sizing the materials to pass 100% of -8mm
  • All materials handled by conveyor belts then transport product to piles
  • Mixing & blending the product to get the required homogenous
  • Drying the product by solar sun and wind energy to reduce moisture content.
  • Hauling the oversize (reject) material to waste yards (Stockpiles) and dozing
  • All productivity maintenance activities of conveyor belts and vibrating screens plants performed by in house team.