Overburden Removal , mining , screening , Drying & transporting phosphate in orebody 45
- Project Name: Overburden Removal , mining , screening , Drying & transporting phosphate in orebody 45
- Location of Project : Al Abiad Mine
- Client : Jordanian Phosphate Company (JPMC)
- Awarded date of Project : 11-2022
- Quantities of Project :
- Overburden removal (OB) quantities = 20.0 Million BCM
- Mining Phosphate quantities =1.3 Million BCM
- Screening & Crushing quantities = 0 Million Ton
- Completion = 10 %
- Scope of Work :
- Overburden & internal waste Removal using excavator & wheal loader and transport the OB to the waste yards and cleaning with dozing.
- Phosphate Mining , Cleaning by graders and dozers.
- Transportation using dump truck to screen unit
- Crushing & Screening Quantities
- Operate (closed vibrating plant system) which high by max. the yield and min. rejection.
- Feeding 50cm hopper by wheel loaders & dump trucks
- Classification / separation of materials by Jaw & Rotary crusher
- Crushing & sizing the materials to pass 100% of -4mm & -8mm
- All materials handled by conveyor belts then transport product to piles
- Mixing & blending the product to get the required homogenous
- Drying the product by solar sun and wind energy to reduce moisture content.
- Drying the product by Dryer unit to reduce moisture content (3%)
- Hauling the oversize (reject) material to waste yards (Stockpiles) and dozing
- Use wheel loader for loading dispatching trucks for direct shipping & transportation to Al Abiad Mine (17Km).
- All productivity maintenance activities of conveyor belts and vibrating screens plants performed by in house team.