Overburden removal , mining A1,A2 , A3 layers & screening A2 layers in dragline Eshidya

  • Project Name : Overburden removal , mining A1,A2 , A3 layers & screening A2 layers in dragline Eshidya
  • Location of Project : Eshidya Mine
  • Client : Jordanian Phosphate Company (JPMC)
  • Awarded date of Project : 4-2018
  • Quantities of Project :
  • Overburden Removal (OB ) quantities = 22.5 Million BCM
  • Mining Phosphate (A1 , A3 ) quantities 3.8 Million BCM  ( Storage )
  • Inter waste (IW1 , IW2 )  removal quantities = 97 Million BCM
  • Mining Phosphate (A2) quantities = 66 Million BCM
  • Screening & Crushing (A2) quantities = 14 Million  ton
  • Completion = 100 %
  • Scope of Work:
  • Overburden & Internal waste Removal using excavator & wheal loader and transport the OB to the waste yards and cleaning with dozing.
  • Phosphate Mining layers A1 & A2 & A3 Cleaning by graders and dozers.
  • Transportation using dump truck to screen unit (A2).
  • Crushing & Screening A2 Quantities
  • Operate (closed vibrating plant system) which high by max. the yield and min. rejection.
  • Feeding 50cm hopper by wheel loaders & dump trucks
  • Classification / separation of materials by grizzly
  • Crushing & sizing the materials to pass 100% of -6mm & -4mm
  • All materials handled by conveyor belts
  • Transport product to banker then go to stacker then dispatching
  • Mixing & blending the product to get the required homogenous
  • Hauling the oversize (reject) material to waste yards (Stockpiles) and dozing

All productivity maintenance activities of conveyor belts and vibrating screens plants performed by in house team .